# How to Govern a Digital Product Passport Programme

> A vendor neutral programme governance model for Digital Product Passports: five governance levels, seven decision domains, a governed decision cycle, decision rights, a decision rights matrix, escalation, risk and exception governance, scope control, organisational change and adoption.

## Executive Summary

Most [Digital Product Passport](/docs/knowledge-base/glossary/digital-product-passport) programmes
that stall do not stall for technical reasons. They stall because a question arrives that nobody has
the authority to answer. Which product group goes first when the requirements for the second are
still uncertain. Whether a data element with no authoritative source can be published with a stated
limitation. Whether a critical supplier that cannot deliver evidence by the pilot date should be
carried, deferred or replaced. Whether a capability that assurance judged ready with conditions may
be deployed, and who then owns those conditions. Each of these is a decision. None of them is
technical. All of them stop work until someone with standing decides.

Governance is the system that makes those decisions possible. It is not a steering committee, and it
is not the reporting pack presented to one. Governance establishes accountability, delegates
authority, frames and routes decisions, resolves conflict, accepts or escalates risk, controls
scope, prioritises investment, approves change, governs adoption and reviews outcomes. Committees
are one mechanism through which governance may operate. Where the two are confused, the organisation
acquires meetings and loses decisions.

This article sets out **The DPP Programme Governance Model**, a vendor neutral framework in three
parts. Five governance levels answer **where authority sits**: executive accountability, programme
governance, domain authority, delivery and operational control, and oversight and feedback. Seven
decision domains answer **what requires governance**: regulatory and scope, data and evidence,
architecture and technology, suppliers and ecosystem, investment and priority, risk and assurance and
exceptions, and change and people and adoption. A governed decision cycle answers **how a decision is
governed**: identify, frame, assign authority, decide, record, execute, review, and back to identify.
Accountability and decision rights cut across all three.

The article closes the organisational half of implementation. The preceding seven articles in this
pillar explain how to become ready, plan, engage suppliers, validate data, manage evidence, assure the
capability and operate it. This one explains who decides, on what basis, with what authority, and how
the organisation is changed so that the capability is actually used rather than merely deployed.

TBF-037 The DPP Programme Governance Model

Governance levels say where authority sits. Decision domains say what requires governance. The
decision cycle says how a decision is governed.

Governance levels: where does authority sit?

1. L1 Executive accountability

   Sponsorship, investment authority, enterprise priority, major risk acceptance
2. L2 Programme governance

   Scope, priority, dependencies, funding allocation, readiness, escalation
3. L3 Domain authority

   Regulatory, product, data, architecture, security, supplier, evidence, operations
4. L4 Delivery and operational control

   Implementation, remediation, release, supplier action, testing, assurance
5. L5 Oversight and feedback

   Assurance findings, metrics, audit, regulatory change, adoption signals

Levels 1 to 4 delegate downward. Level 5 returns evidence upward, closing the loop.

Decision domains: what requires governance?

* D1 Regulatory & scope Products, markets, requirements, interpretation
* D2 Data & evidence Ownership, sources, thresholds, exceptions
* D3 Architecture & technology

  Principles, federation, integration, technical risk
* D4 Suppliers & ecosystem Expectations, remediation, dependency risk
* D5 Investment & priority

  Funding, mandatory versus optional, deferral, reuse
* D6 Risk, assurance & exceptions Acceptance, blockers, conditions, escalation
* D7 Change, people & adoption Role change, process change, capability, adoption

Decision cycle: how is a decision governed?

1. 1 Identify
2. 2 Frame
3. 3 Assign authority
4. 4 Decide
5. 5 Record
6. 6 Execute
7. 7 Review

Review returns to identify. Material findings re-enter governance as new decisions.

Cross-cutting: accountability and decision rights

Accountability cannot be delegated away. Authority is the right to decide. Responsibility is the
obligation to perform. Consultation is input without a vote. Information is awareness without
input.

The DPP Programme Governance Model is a tieback educational model. The five levels, seven domains
and seven step cycle are educational constructs, not regulatory classifications, mandated
organisational structures or a substitute for statutory accountability, and no legislation
requires an organisation to govern a passport programme in this form.

Framework TBF-037

The DPP Programme Governance Model

A programme governance model for Digital Product Passports combining five governance levels,
executive accountability, programme governance, domain authority, delivery and operational
control, and oversight and feedback, with seven decision domains, regulatory and scope, data and
evidence, architecture and technology, suppliers and ecosystem, investment and priority, risk
and assurance and exceptions, and change and people and adoption, and a governed decision cycle
of identify, frame, assign authority, decide, record, execute and review, under a cross-cutting
decision rights model separating accountability, authority, responsibility, consultation and
information, supported by a decision rights matrix, escalation triggers, exception governance,
scope control distinguishing required scope from optional capability, organisational change and
adoption governance, a programme change impact assessment and a decision oriented metric set. It
is built on the principle that governance is a system rather than a steering committee, that
meetings are mechanisms through which governance may operate rather than governance itself, and
that a technically deployed capability is not an organisationally adopted one. It governs
authority across the implementation roadmap TBF-031 rather than restating its stages, holds the
deployment and condition acceptance authority over the readiness conclusions of the assurance
model TBF-035, sets the exception and escalation boundaries above the routine controls of the
data validation control model TBF-033 and the evidence lifecycle TBF-034, decides supplier
escalation where the supplier readiness model TBF-032 reaches its limits, governs deviations
from the reference architecture TBF-030, hands the continuing flow of operational events to the
operating model TBF-036, and contains rather than duplicates the product data governance and
stewardship disciplines of TBF-023 and TBF-026.

## Table of Contents

* [Definition](#definition)
* [Why DPP Programme Governance Matters](#why-dpp-programme-governance-matters)
* [Governance Is More Than a Steering Committee](#governance-is-more-than-a-steering-committee)
* [Product Data Governance vs Programme Governance vs Operations](#product-data-governance-vs-programme-governance-vs-operations)
* [The DPP Programme Governance Model](#the-dpp-programme-governance-model)
* [Level 1: Executive Accountability](#level-1-executive-accountability)
* [Level 2: Programme Governance](#level-2-programme-governance)
* [Level 3: Domain Authority](#level-3-domain-authority)
* [Level 4: Delivery and Operational Control](#level-4-delivery-and-operational-control)
* [Level 5: Oversight and Feedback](#level-5-oversight-and-feedback)
* [Domain 1: Regulatory and Scope](#domain-1-regulatory-and-scope)
* [Domain 2: Data and Evidence](#domain-2-data-and-evidence)
* [Domain 3: Architecture and Technology](#domain-3-architecture-and-technology)
* [Domain 4: Suppliers and Ecosystem](#domain-4-suppliers-and-ecosystem)
* [Domain 5: Investment and Priority](#domain-5-investment-and-priority)
* [Domain 6: Risk, Assurance and Exceptions](#domain-6-risk-assurance-and-exceptions)
* [Domain 7: Change, People and Adoption](#domain-7-change-people-and-adoption)
* [The Governed Decision Cycle](#the-governed-decision-cycle)
* [Decision Rights](#decision-rights)
* [Accountability, Authority and Responsibility](#accountability-authority-and-responsibility)
* [Using RACI Appropriately](#using-raci-appropriately)
* [Building a Decision Rights Matrix](#building-a-decision-rights-matrix)
* [Programme Governance Structures](#programme-governance-structures)
* [Escalation](#escalation)
* [Risk and Exception Governance](#risk-and-exception-governance)
* [Scope Governance](#scope-governance)
* [Organisational Change](#organisational-change)
* [Driving Adoption](#driving-adoption)
* [Change Impact Assessment](#change-impact-assessment)
* [Governance Across the DPP Lifecycle](#governance-across-the-dpp-lifecycle)
* [Project vs Programme vs Operations](#project-vs-programme-vs-operations)
* [Programme Metrics](#programme-metrics)
* [Practical Example](#practical-example)
* [Common Mistakes](#common-mistakes)
* [Frequently Asked Questions](#frequently-asked-questions)
* [Key Takeaways](#key-takeaways)
* [Related Glossary Terms](#related-glossary-terms)
* [References](#references)

## Definition

The system through which an organisation establishes accountability for its Digital Product
Passport programme, delegates authority, frames and routes decisions, resolves conflict, accepts
or escalates risk, controls scope, prioritises investment, approves change, governs organisational
adoption and reviews outcomes, so that material programme decisions are made by identified people
on an identified basis and are recorded, executed and reviewed rather than assumed.

Three boundaries in that definition matter.

Governance is a **system**, not a forum. A steering committee that meets monthly is a mechanism. If
the mechanism disappeared, the organisation would still need to decide who may accept a data
exception, who may approve deployment and who owns unresolved adoption. Those obligations are the
governance. The forum is where some of them are exercised.

Governance concerns **material** decisions. A programme that routes every validation exception,
supplier query and defect to a governance body has not strengthened governance; it has created a
bottleneck and taught the organisation to work around it. Governance sets the boundary between
delegated routine and reserved decisions, then holds it.

Governance is **not statutory accountability**. Legal accountability for products placed on the
market rests where legislation places it, on the relevant
[economic operator](/docs/knowledge-base/glossary/economic-operator), regardless of how an
organisation arranges its internal governance. Programme governance is an enterprise control that
helps the organisation meet its obligations. It does not transfer, dilute or replace them.

## Why DPP Programme Governance Matters

A passport programme has four properties that make governance unusually consequential.

**It is cross-functional by construction.** Compliance interprets requirements. Product teams own
specifications. Data teams own sources and quality. Architecture owns integration. Procurement owns
supplier relationships. Sustainability owns claims. Operations owns continuity. No single function
can deliver a passport, and none can be given unilateral authority over the others. Something must
arbitrate.

**It publishes.** Most internal programmes fail privately. A passport programme makes continuing
public statements about products, visible to customers, competitors, downstream operators and
[market surveillance](/docs/knowledge-base/glossary/market-surveillance) authorities. The
consequences of an unowned decision do not stay inside the organisation.

**It operates under moving requirements.** The
[ESPR](/docs/knowledge-base/glossary/espr) framework sets the structure; product specific obligations
arrive through [delegated acts](/docs/knowledge-base/glossary/delegated-act) over time. Decisions must
therefore be made under acknowledged uncertainty, revisited when requirements firm up, and recorded
well enough that the organisation can explain later why it decided as it did with what it knew then.

**It changes how people work.** Data ownership becomes explicit where it was implicit. Evidence
becomes a governed asset rather than an email attachment. Suppliers are asked for information they
have never been asked for. Approval routes change. Programmes that treat this as a communications
exercise ship a capability that nobody uses.

> **The cheapest governance test**
>
> Ask five people in different functions the same question: who can approve publishing a product
> group whose data is complete but whose supporting evidence is still partial? If you get five
> answers, or five hesitations, the programme does not have a governance problem it will discover
> later. It has one now.

## Governance Is More Than a Steering Committee

The most common failure in this space is a category error: treating a meeting as the governance.

A steering committee is a mechanism through which certain governance responsibilities may be
exercised. It is a good mechanism for cross-functional coordination, for decisions that need several
perspectives, and for visible executive attention. It is a poor mechanism for decisions that need
speed, for decisions requiring deep specialist judgement, and for the hundreds of smaller decisions
that a programme generates weekly.

Governance is the system through which accountability is established, authority is delegated,
decisions are made, conflicts are resolved, risks are accepted or escalated, scope is controlled,
investment is prioritised, changes are approved, adoption is governed and outcomes are reviewed. Those
functions must exist whether or not a committee does. Where they exist only inside a committee, three
symptoms follow reliably: decisions wait for the calendar, the committee agenda fills with operational
detail nobody else was empowered to settle, and shadow governance emerges as teams quietly decide
things themselves because waiting is worse.

#### Confusing reporting with governance

A monthly pack showing status, milestones and a risk log is reporting. Governance is what happens
when the pack shows something unacceptable: who decides, on what authority, by when, recorded how.
Programmes with excellent reporting and weak decision rights look healthy until the first decision
that nobody owns.

## Product Data Governance vs Programme Governance vs Operations

Three governance concepts operate in a passport programme. They interact constantly, and they are not
interchangeable.

**[Product data governance](/docs/knowledge-base/enterprise-systems-and-data-architecture/what-is-product-data-governance)**
asks who owns, controls and stewards product data. It defines ownership, stewardship,
[authoritative sources](/docs/knowledge-base/glossary/authoritative-source), quality expectations,
definitions and policies for product information as an enterprise asset. It exists whether or not a
passport programme exists, and it continues after the programme ends. TBF-023 sets out that
discipline, supported by the stewardship model in TBF-026.

**DPP programme governance** asks who has authority to make programme decisions, how those decisions
are made, and how accountability, scope, risk, investment, change and adoption are governed. It is
bounded in time to the programme, though parts of it become permanent. That is the subject of this
article.

**[DPP operations](/docs/knowledge-base/implementation/how-to-operate-a-digital-product-passport-programme)**
asks how the live capability is kept trustworthy: how operational events are detected, assessed,
assigned, resolved, validated and learned from. TBF-036 sets out that model, with its own governance
band covering operational accountability and escalation.

The relationship is one of nesting rather than hierarchy. Product data governance operates inside the
wider programme governance model during implementation, and continues beyond it. Operational
governance handles the continuing flow of operational events, escalating to programme governance only
where impact exceeds delegated authority. Programme governance does not approve routine data
decisions, routine evidence decisions or routine operational events. It establishes who may make them
and what must come back up.

#### Three governance concepts, one question

A supplier submits a recycled content figure that conflicts with the figure held in the enterprise
source. Product data governance determines which source is authoritative and who stewards the
conflict. Operational governance handles the event: detection, assessment, assignment, resolution
and validation. Programme governance is involved only if the resolution requires accepting a
documented exception on a regulated claim, changing an agreed authoritative source, or escalating
a supplier relationship that can no longer meet programme requirements.

## The DPP Programme Governance Model

The framework combines three dimensions. Each answers a different question, and none of them works
alone.

**Five governance levels** answer: where does authority sit? They describe the vertical structure of
accountability, from executive accountability down to delivery control, closed by an oversight and
feedback level that returns evidence upward.

**Seven decision domains** answer: what requires governance? They describe the horizontal subject
matter of programme decisions, so that a programme can see whether it has authority defined for each
category rather than only for the categories it happens to have encountered.

**A governed decision cycle** answers: how is a decision governed? It describes the treatment any
material decision receives, from identification through framing, authority assignment, decision,
recording, execution and review.

Accountability and decision rights cut across all three. The levels are meaningless without them,
because a level without defined rights is a name on a chart.

#### Define the model before you need it

The value of the model is realised at the moment of contention: two functions disagree, a deadline
is at risk and the decision has regulatory consequences. Defining authority in that moment is
negotiation, not governance. Defining it in advance, in the calm of planning, makes the same
moment a routine decision with a known owner.

## Level 1: Executive Accountability

Purpose: establish ultimate organisational accountability for the programme.

Responsibilities typically held at this level include strategic sponsorship, investment authority
above defined thresholds, positioning of the programme against competing enterprise priorities,
acceptance of major risk, resolution of cross-functional conflict that programme governance cannot
settle, major scope decisions such as adding or removing product groups or markets, and ownership of
strategic regulatory exposure.

This article does not prescribe a title. Which executive holds accountability varies with how the
organisation is structured and where product compliance, product data and sustainability
responsibilities already sit. What matters is that accountability is **held by a named person**, that
the person understands what they are accountable for, and that the accountability is not diffused
across a group. A committee can decide. A committee cannot be accountable.

Two failure patterns are common at this level. Sponsorship that is nominal, where an executive lends
a name but does not engage with decisions, produces a programme that cannot escalate. Sponsorship
that is operational, where an executive decides matters that should be delegated, produces a
programme that cannot move without them.

## Level 2: Programme Governance

Purpose: coordinate cross-functional programme decisions.

Responsibilities typically include programme scope, priority sequencing across product groups and
markets, dependency management between workstreams, roadmap decisions, allocation of funding within
an approved envelope, ownership of major risks, resolution of cross-functional issues, readiness
decisions ahead of pilot and deployment, the escalation route to Level 1, and review of whether the
programme is achieving its intended outcomes.

This level is frequently exercised through a steering structure, and that is a reasonable choice. The
qualification is the one made throughout this article: the structure is the mechanism, not the
governance. If the steering group is unavailable for three weeks, the programme should still know who
may decide what in the interim, and under which constraints.

Level 2 is also where the boundary with Level 3 is set. A programme governance body that finds itself
adjudicating architectural detail, validation rule thresholds or supplier correspondence has usually
failed to establish domain authority, not discovered that it needs more agenda time.

## Level 3: Domain Authority

Purpose: provide accountable authority within specialist domains.

Domains commonly include regulatory and compliance, product, data, architecture, technology,
security, supplier and procurement, evidence, operations and sustainability. The specific list should
reflect the organisation rather than this article.

The essential property is explicitness. A programme should be able to say, without discussion, who
may determine that a source is authoritative, who may approve an integration pattern, who may accept
a validation exception of a given severity, who may approve an evidence classification and who may
approve a change to published access. Where that is unclear, decisions either escalate unnecessarily
or are made by whoever is nearest, which is the definition of shadow governance.

Domain authority should also carry stated limits. Authority to accept a data exception is not
authority to accept it on a regulated claim, indefinitely, across every market. Limits by severity,
duration, scope and regulatory significance turn delegation into a control rather than a transfer.

> **Delegate with three qualifiers**
>
> Effective delegation names the decision, the holder and the limit. For example: the data domain
> authority may accept informational validation exceptions on non-regulated elements for up to
> ninety days, with a recorded compensating action; anything blocking, regulated or longer
> escalates. Without the limit, delegation quietly becomes abdication.

## Level 4: Delivery and Operational Control

Purpose: translate decisions into controlled execution.

This level covers implementation work, remediation, release, supplier action, data correction,
evidence action, operational change, testing and assurance. It is where decisions become
consequences.

The relevant models already exist and are not restated here. The
[implementation roadmap](/docs/knowledge-base/implementation/how-to-build-a-digital-product-passport-implementation-roadmap)
(TBF-031) describes the stages and workstreams through which delivery proceeds, each with an exit
gate. The
[operating model](/docs/knowledge-base/implementation/how-to-operate-a-digital-product-passport-programme)
(TBF-036) describes how the deployed capability is run. Governance sits above both: it decides at the
gates, it sets the delegated authority within which delivery and operations act, and it receives what
they escalate.

The practical governance question at this level is narrow but important: does execution actually
follow the decision? A decision recorded, communicated and then not implemented is common enough to
warrant explicit tracking. The review step of the decision cycle exists partly for this reason.

## Level 5: Oversight and Feedback

Purpose: return information into governance so that the model is a loop rather than a hierarchy.

Inputs include assurance findings, operational metrics, incidents, internal or external audit
findings, regulatory developments, supplier performance, data quality trends, adoption signals and
programme outcome measures.

Without this level, the model is a delegation chart. Decisions flow down, nothing comes back, and the
organisation discovers the consequences of its decisions through failure rather than through
oversight. With it, three things become possible: decisions can be reviewed against what actually
happened, systemic patterns become visible where individual events would not, and the boundary of
delegated authority can be adjusted on evidence rather than instinct.

Oversight should be proportionate. Feeding every operational metric into programme governance
recreates the bottleneck the model exists to avoid. The useful filter is materiality: what changes a
decision, invalidates an assumption, breaches a condition or reveals a pattern.

## Domain 1: Regulatory and Scope

Decisions in this domain include which products are in scope, which markets are in scope, which
requirements are considered applicable, which assumptions remain open, what constitutes a material
regulatory change requiring programme response, and where regulatory interpretation ends and
enterprise policy begins.

That last distinction is the one most often skipped. A requirement derived from legislation is not the
same as a choice the organisation has made. Both may be binding internally. Only one of them is
externally mandated. Recording which is which matters when requirements firm up, because enterprise
policy can be revisited on cost or feasibility grounds while a legal requirement cannot.

Scope decisions in this domain are the highest leverage decisions in the whole programme. Adding a
product group multiplies data work, supplier engagement, evidence acquisition, validation coverage and
assurance scope simultaneously. See
[which products will require a passport](/docs/knowledge-base/regulations/which-products-will-require-a-digital-product-passport)
and [when obligations become mandatory](/docs/knowledge-base/regulations/when-will-digital-product-passports-become-mandatory)
for the regulatory background these decisions rest on.

## Domain 2: Data and Evidence

Decisions in this domain include who owns each required information element, which source is
authoritative where several exist, what evidence is required to support a given claim, what quality
thresholds apply, which exceptions are acceptable and who may accept them.

Governance does not perform these functions. The
[data validation control model](/docs/knowledge-base/implementation/how-to-validate-digital-product-passport-data)
(TBF-033) defines the states, gates, control classes and severities through which information becomes
publishable. The
[evidence lifecycle](/docs/knowledge-base/implementation/how-to-manage-evidence-for-digital-product-passports)
(TBF-034) defines how evidence is requested, associated, validated, verified, accepted, used and
retired. Product data governance (TBF-023) and stewardship (TBF-026) define ownership and care of the
underlying data, and the
[system of record](/docs/knowledge-base/glossary/system-of-record) and
[authoritative source](/docs/knowledge-base/glossary/authoritative-source) concepts define where truth
lives.

What programme governance contributes is authority. Who may declare a source authoritative when two
systems disagree. Who may accept a blocking exception, and under what compensating control. Who may
lower a quality threshold, and for how long. Who may decide that an element will be published with a
stated limitation rather than withheld. These are decisions with regulatory consequence, and they are
routinely made informally by whoever is under the most delivery pressure.

#### Routing routine validation decisions to programme governance

If a governance body reviews individual validation failures, two things happen: the body cannot
attend to material decisions, and validation slows to the meeting cadence. Governance should set
the severity boundary above which an exception must come up, and delegate everything below it with
recorded limits.

## Domain 3: Architecture and Technology

Decisions include which architectural principles apply, which capabilities are enterprise wide and
which are federated to business units or product groups, which integrations are required, what
technical risk is acceptable, and what kind of change triggers architecture review.

The
[enterprise reference architecture](/docs/knowledge-base/enterprise-systems-and-data-architecture/building-an-enterprise-digital-product-passport-architecture)
(TBF-030) supplies the layered model these decisions apply to. Governance decides the deviations. In
practice the recurring architecture decision in passport programmes is not which technology to select
but whether a product group may solve a problem locally when an enterprise capability is planned but
not yet available. That is a governance decision with a long tail: local solutions become permanent,
and the enterprise capability arrives to find its users already served.

Deviation decisions are therefore best treated as conditional rather than binary. Approve the local
solution, record the condition under which it converges, and set the review trigger. The decision
cycle described later makes that a routine shape rather than an exception.

## Domain 4: Suppliers and Ecosystem

Decisions include which suppliers require action, what is expected of them, who owns supplier
remediation, what happens when a supplier cannot comply with programme requirements, and which
ecosystem dependencies create programme risk.

The
[supplier readiness model](/docs/knowledge-base/implementation/how-to-prepare-suppliers-for-digital-product-passports)
(TBF-032) provides the segmentation, requirement definition, capability assessment, exchange,
validation, remediation and monitoring mechanics. Governance handles the decisions those mechanics
cannot make.

The hardest of these is the non-compliant critical supplier. The mechanics can establish that a
supplier cannot deliver required information within the required timescale. Only governance can decide
whether the programme carries the gap with a documented limitation, defers the affected products,
changes the scope of what is published, invests in supplier enablement, escalates commercially, or
accepts the consequences of substitution. Each option has cost, risk and regulatory implications
distributed across different functions, which is precisely why the decision is a governance decision
rather than a procurement one.

## Domain 5: Investment and Priority

Decisions include what is funded, what is treated as mandatory, what is optional, what is deferred,
where scarce capacity is concentrated and which capabilities are reused across product groups.

This is governance of investment, not the calculation of investment cases. How an organisation
appraises cost and benefit is its own financial discipline and is out of scope here. What is in scope
is the governance question: who decides that a capability is funded, on what basis, and what happens
when the answer changes.

Two distinctions repay attention. The distinction between **mandatory** and **valuable** is the single
most useful prioritisation instrument a passport programme has, because a great deal of desirable
functionality attaches itself to a compliance-driven programme. The distinction between **product
group specific** and **reusable enterprise** capability determines whether the second product group
costs as much as the first. Programmes that fund each product group independently discover this too
late to fix cheaply.

Scarcity in passport programmes is rarely financial in the first instance. It is usually specialist
capacity: the small number of people who understand the product data, the evidence, the sources and
the requirements well enough to make progress. Governance that allocates money without allocating that
capacity has not really prioritised.

## Domain 6: Risk, Assurance and Exceptions

Decisions include which risks may be accepted and by whom, which defects block deployment, which
conditions may accompany deployment, which exceptions require escalation and when a readiness decision
must be reconsidered.

The
[assurance model](/docs/knowledge-base/implementation/how-to-test-and-assure-a-digital-product-passport)
(TBF-035) produces a governed readiness conclusion: ready, ready with conditions, or not ready.
Assurance determines the state of the evidence. It does not, by itself, authorise deployment. The
authority to deploy, to accept conditions, to own them and to set their deadlines is a governance
decision, and separating the two is deliberate: the function that judges readiness should not be the
function that overrides its own judgement under delivery pressure.

Ready with conditions is the state that most often decays. Conditions accepted at deployment are
frequently accepted by a project that will not exist in six months. Governance should therefore treat
every accepted condition as an assignment: named owner, deadline, monitoring, closure evidence and an
escalation route if it is not met. TBF-036 describes how open conditions migrate into operational
tracking. Governance is what makes that migration a requirement rather than a hope.

## Domain 7: Change, People and Adoption

Decisions include which teams must change, which responsibilities are new, which processes change, who
requires training, which behaviours must change, how adoption is measured, and who owns unresolved
adoption barriers.

This domain is the one most often absent from passport governance, and its absence is not neutral. A
passport capability that is technically deployed and organisationally unadopted publishes information
maintained by a process nobody is following, which is a worse position than not having deployed,
because the organisation now believes it is compliant.

The domain is treated at length in the sections on
[organisational change](#organisational-change), [adoption](#driving-adoption) and
[change impact assessment](#change-impact-assessment) below. What belongs here, at the level of
decision domains, is the governance point: adoption requires decisions, and those decisions need
owners. Who resolves a functional leader's refusal to reallocate steward capacity. Who decides that an
old process is switched off rather than left running in parallel. Who owns the fact that six months
after deployment, three of eight product teams are still working outside the governed workflow. If
those questions have no owner, adoption is a hope with a training budget attached.

## The Governed Decision Cycle

Any material decision receives the same seven step treatment. The value of a standard shape is that
decisions stop depending on the individual habits of whoever raised them.

**Step 1: Identify.** Recognise that a decision, issue, risk or change requires governance at all. The
first discipline is negative: most matters should not enter this cycle. A validation failure with a
known owner and a delegated resolution is not a governance decision. A validation failure that reveals
no authoritative source exists for a regulated element is.

**Step 2: Frame.** Define the question requiring decision, its scope, the supporting evidence, the
realistic options, dependencies, risks, regulatory implications, affected stakeholders and the
decision deadline. A poorly framed decision produces poor governance regardless of who decides it.
Most decisions that a governance body defers are deferred because they arrived as a topic rather than
as a question with options.

**Step 3: Assign authority.** Determine who holds the right to decide. Authority should reflect the
subject, the impact, the risk, the scope, the financial consequence and the regulatory consequence.
Consensus is a useful input and an expensive requirement; requiring it for every decision guarantees
that the most contested and time-critical decisions are the slowest.

**Step 4: Decide.** Produce an outcome. Common outcomes include approve, reject, approve with
conditions, defer pending specified evidence, and escalate. These are educational examples rather than
a mandated set. Deferral should carry the same discipline as approval: what evidence, by when, decided
by whom on return.

**Step 5: Record.** Capture what was decided, why, by whom, on the basis of what information, the
scope over which it applies, any conditions attached and what would trigger review. The test of a
recorded decision is whether someone who was not present can understand it in eighteen months, which
is roughly when the first audit, requirement change or personnel change will ask them to.

**Step 6: Execute.** Convert the decision into programme action, technical change, supplier action,
data action, evidence action, policy or process change, or organisational change. A decision without
execution is not governance; it is a minute.

**Step 7: Review.** Determine whether the decision achieved its intended result, whether its
assumptions remain valid, whether conditions were met, whether new information changes it, and whether
escalation is now required. Material findings return to step one as new decisions, which is what makes
the model a loop.

#### The cycle applied to a small decision

A product group asks to publish a durability claim supported by a supplier test report that has
not been independently verified. Identify: this is a governance decision because it concerns a
regulated claim. Frame: the claim, the evidence available, the verification gap, the options to
publish with a stated basis, defer the claim, or obtain verification, the cost and lead time of
each, and the deadline. Assign authority: the compliance domain authority, because the consequence
is regulatory rather than technical. Decide: approve with conditions, publishing the claim with
its evidentiary basis recorded, subject to obtaining verification within one review period.
Record: the decision, its rationale, its scope limited to this product group, its condition and
its review trigger. Execute: publish, and raise the verification action against a named owner.
Review: at the deadline, confirm verification or reconsider the claim.

## Decision Rights

Decision rights are the allocation of who may decide what. They are the operative content of a
governance model, and most models that fail have levels and forums but no rights.

Unclear decision rights produce six recognisable symptoms.

**Delay.** Decisions circulate looking for an owner. The programme reports itself blocked on analysis
when it is blocked on authority.

**Duplicate approval.** Several parties each believe approval is theirs to give, so everything is
approved repeatedly and slowly, and no single approval means anything.

**Conflicting decisions.** Two functions decide the same matter differently, both in good faith, and
the conflict surfaces later in the form of inconsistent data, inconsistent supplier expectations or
inconsistent publication.

**Unowned risk.** A risk is visible to everyone and accepted by no one. It appears on the risk log for
months with a status and no decision, until it becomes an issue and acquires an owner by accident.

**Uncontrolled exceptions.** Where nobody has explicit authority to accept exceptions, exceptions are
accepted implicitly by proceeding. The organisation ends up with an exception population it never
approved and cannot enumerate.

**Shadow governance.** Teams that cannot get decisions make them locally. This is usually rational
behaviour under deadline pressure, and it is the most damaging symptom, because the organisation loses
visibility of the decisions being made in its name.

#### Write rights as sentences, not roles

"Data governance owns data decisions" is not a decision right. "The data domain authority may
accept warning severity validation exceptions on non-regulated elements for up to one review
period, with a recorded compensating action; blocking severity or regulated elements escalate to
programme governance" is. The difference is whether someone under pressure can act on it without
asking.

## Accountability, Authority and Responsibility

These five terms are used interchangeably in most programmes, and the imprecision is expensive.

**Accountability** is answerability for an outcome. It cannot be delegated away: delegating the work
does not delegate the answerability. Accountability should rest with one identified person for any
given outcome.

**Authority** is the right to decide. It can be delegated, and it should be, with stated limits.
Authority without accountability produces decisions nobody stands behind. Accountability without
authority is the most common and most demoralising position in a passport programme: a named owner who
cannot decide anything that matters.

**Responsibility** is the obligation to perform work. Several people can be responsible for parts of
the same outcome. Responsibility does not confer the right to decide, which is the distinction most
frequently lost.

**Consultation** is the right to be asked before a decision, with the obligation to respond in time.
It is input, not a vote. A consulted party that behaves as though it holds a veto has been given
unclear rights, not strong governance.

**Information** is the right to be told after a decision. It carries no input and no veto. Generous use
of the informed category is usually a sign of health; generous use of the consulted category is usually
a sign that nobody wanted to say who decides.

> **One accountable person per outcome**
>
> If two names appear against accountability for the same outcome, the outcome has no accountable
> person. Shared accountability is a comfortable formulation that reliably produces mutual
> assumption when the outcome is in trouble.

## Using RACI Appropriately

RACI is one responsibility mapping technique among several. It can be a useful documentation
instrument inside a governance model. It is not a governance model, and treating it as one is a common
and consequential error.

The four categories are **responsible**, the parties who perform the work; **accountable**, the single
party answerable for the outcome; **consulted**, the parties whose input is sought before the decision;
and **informed**, the parties told after it.

Used well, a RACI captures existing decisions about rights in a form people can consult. Used badly, it
produces five recurring problems.

**Multiple accountable parties.** The most frequent defect. Two or three names in the accountable
column means the matrix has recorded an unresolved disagreement rather than a decision.

**Everybody consulted.** Consultation is cheap to assign and expensive to honour. A matrix in which
eight functions are consulted on each decision either slows every decision to its slowest participant
or is quietly ignored, which teaches the organisation that the matrix is decorative.

**No explicit decision authority.** RACI describes involvement, not the right to decide. Accountable is
often assumed to mean deciding, but the accountable party may be answerable for an outcome whose key
decisions sit elsewhere. Where that is the case, the matrix must say so or the ambiguity survives.

**Confusing responsibility with authority.** A team responsible for building an integration is not
thereby authorised to approve an architectural deviation. Matrices that conflate the two effectively
delegate authority by accident.

**A matrix nobody uses.** The commonest end state. A detailed matrix is produced during mobilisation,
circulated once, and never opened again, while the programme continues to decide things by escalation
and habit.

RACI is optional. Some organisations achieve clearer results with a plain decision rights matrix, which
records decisions rather than activities, and which is described next. Where an organisation already
uses RACI comfortably, extending it to the passport programme is sensible. Where it does not, adopting
it for this programme alone is rarely worth the effort.

## Building a Decision Rights Matrix

A decision rights matrix is an implementation instrument, not a regulatory artefact. Its purpose is to
make authority consultable. It differs from a RACI in orientation: a RACI maps activities to
involvement, while a decision rights matrix maps **decisions** to **authority**.

Fields that earn their place include:

* **Decision ID.** A stable reference so that decisions can be cited later.
* **Decision category.** Which of the seven decision domains it belongs to.
* **Decision description.** The question in plain terms.
* **Decision owner.** Who brings the decision, frames it and ensures it is executed.
* **Accountable authority.** Who holds the right to decide, with any stated limit.
* **Contributors.** Who must be consulted, and by when their input is required.
* **Escalation authority.** Where the decision goes if the limit is exceeded or agreement fails.
* **Evidence required.** What must be present for the decision to be made rather than deferred.
* **Decision deadline.** When the decision must be made for the programme not to be harmed.
* **Decision status.** Open, decided, conditional, deferred, escalated or superseded.
* **Conditions.** What must hold for a conditional decision to remain valid.
* **Review trigger.** What event or date returns the decision to governance.

Representative passport decisions worth recording in advance rather than discovering under pressure:

| Decision                                       | Typical domain | Typical authority level                            |
| ---------------------------------------------- | -------------- | -------------------------------------------------- |
| Approve product scope for a release wave       | D1             | Programme governance, executive for major change   |
| Interpret an ambiguous information requirement | D1             | Regulatory domain authority                        |
| Declare an authoritative source                | D2             | Data domain authority                              |
| Accept a data exception                        | D2             | Data or compliance authority by severity           |
| Accept an evidence gap with a stated basis     | D2             | Compliance domain authority                        |
| Approve an architecture deviation              | D3             | Architecture domain authority                      |
| Approve supplier remediation approach          | D4             | Supplier domain authority with programme oversight |
| Deprioritise or defer a product group          | D5             | Programme governance                               |
| Proceed with pilot                             | D6             | Programme governance                               |
| Proceed with deployment                        | D6             | Programme governance                               |
| Accept a ready with conditions outcome         | D6             | Programme governance                               |
| Change publication access for an element       | D2 and D3      | Compliance with security domain authority          |
| Respond to material regulatory change          | D1             | Executive accountability on material exposure      |
| Retire a superseded manual process             | D7             | Functional owner with programme governance         |

The matrix is a living instrument. Its most valuable moment is early, when the programme can still
allocate rights dispassionately, and its most valuable property is brevity: a matrix of twenty
consultable decisions is used, and a matrix of two hundred is filed.

## Programme Governance Structures

Organisations implement governance through structures. Common ones include executive sponsorship,
programme steering, domain forums, architecture governance, data governance, supplier governance,
assurance forums and operational governance.

This article does not prescribe a committee architecture, because the right structure depends on size,
sector, existing governance and the scale of the passport obligation. A smaller organisation may
combine executive accountability and programme governance in one person, run domain authority through
named individuals rather than forums, and hold a single recurring review. A larger organisation may
federate domain authority by business unit, integrate passport decisions into existing architecture and
data governance rather than creating parallel bodies, and reserve a programme forum for cross-cutting
matters only.

Three design principles hold regardless of size.

**Reuse before you create.** If the organisation already has functioning architecture governance and
data governance, routing passport decisions through them is usually better than establishing passport
equivalents, which fragment authority and duplicate attendance.

**Match the mechanism to the decision.** Decisions that need speed should not require a forum.
Decisions that need several perspectives should not be made by one person in a corridor. Decisions with
regulatory consequence should be recorded regardless of who makes them.

**Fewer bodies, clearer rights.** More committees is not more governance. Each additional body dilutes
attendance, lengthens routes and increases the chance that a decision falls between two of them.

#### Building a governance structure before defining decisions

Programmes commonly design the committee architecture first and then look for agendas to fill it.
The more productive order is to list the decisions the programme will have to make, group them,
and only then ask what mechanism each group needs. Some groups need a forum. Many need a named
person and a written limit.

## Escalation

Escalation moves a decision to a higher level of authority. It is a normal, healthy mechanism, and
treating it as evidence of failure is one of the more damaging cultural beliefs a programme can hold,
because it produces the alternative: decisions made below the appropriate level of authority by people
trying not to look like they cannot cope.

Escalation triggers worth defining in advance include:

* **Authority exceeded.** The decision falls outside a stated delegated limit.
* **Unresolved cross-domain conflict.** Two domain authorities disagree and cannot converge in time.
* **Material regulatory risk.** The decision could affect the accuracy or completeness of a regulated
  statement.
* **Material security risk.** The decision affects access, exposure or protection of restricted
  information.
* **Major investment impact.** The decision commits funding or capacity beyond a threshold.
* **Critical supplier dependency.** The decision concerns a supplier whose failure would affect scope,
  timeline or compliance.
* **Deployment blocker.** The decision determines whether deployment can proceed.
* **Unresolved assurance condition.** A condition accepted at deployment has not been met by its
  deadline.
* **Major scope change.** The decision adds or removes product groups, markets or capabilities.

Escalation should carry a framing obligation. An escalation that arrives as a problem consumes the
higher level's time on analysis that should have happened below it. An escalation that arrives as a
framed question with options, evidence, a recommendation and a deadline can usually be decided in the
meeting it reaches.

Escalation should also be time-bounded in both directions: a stated period after which an unresolved
decision escalates automatically, and a stated expectation for how quickly the higher level responds.
Escalation into a queue is not escalation.

## Risk and Exception Governance

Six concepts are routinely conflated in programme reporting, and each needs different governance
treatment.

**Risk** is a possible future event with an adverse effect. It is governed by assessment, mitigation,
acceptance or transfer, and it needs an owner who can act, not merely observe.

**Uncertainty** is not knowing. It differs from risk in that the outcome distribution itself is
unclear, which is the normal condition for requirements not yet set by delegated act. Uncertainty is
governed by assumptions, monitoring and decision deferral with stated triggers, not by mitigation
plans that pretend to precision.

**Issue** is something that has already occurred and requires resolution. It is governed by
assignment, resolution and validation, and it should not sit in a risk log.

**Defect** is a fault in something built or configured. It is governed through delivery and assurance
processes, with severity determining whether it blocks deployment.

**Exception** is an approved departure from a rule, standard, threshold or requirement. It is governed
by explicit acceptance, and it is the category most often created accidentally by proceeding without a
decision.

**Assurance condition** is a requirement attached to a readiness decision under TBF-035. It is governed
as an obligation with an owner and a deadline, and it must survive the transition into operations
described in TBF-036.

Any accepted exception should carry:

* **Scope.** Which products, elements, markets, suppliers or systems it covers, stated narrowly.
* **Rationale.** Why the departure was accepted rather than resolved.
* **Owner.** Who is responsible for the exception and its closure.
* **Authority.** Who accepted it, and under what delegated right.
* **Duration.** A defined end date rather than an indefinite acceptance.
* **Compensating control.** Where appropriate, what reduces the resulting risk in the interim.
* **Review date.** When it is reconsidered.
* **Closure condition.** What must be true for the exception to end.

#### Exceptions without expiry

An exception with no end date is a silent standard change. Programmes that accept a handful of
permanent exceptions in their first year usually cannot enumerate them by their third, and the
aggregate risk becomes invisible precisely because each individual acceptance was reasonable.

## Scope Governance

Passport scope expands more easily than most programme scope, because almost every expansion sounds
responsible.

Scope can grow along at least nine dimensions: products, product groups, markets, suppliers, data
elements, evidence, lifecycle capabilities such as repair or end of life handling, user groups such as
consumers, recyclers, authorities and service providers, and integrations. Each dimension multiplies
against the others. Adding one market to one product group is small. Adding two markets and three
product groups is not additive.

The governing distinction is between **required scope** and **optional capability**. Required scope is
what applicable obligations demand for the products the organisation places on the market, within the
timescales that apply. Optional capability is everything else, however valuable: richer consumer
content, additional traceability depth, analytics, supplier portals, sustainability storytelling,
integration with commercial systems.

Optional capability is not illegitimate. Much of it delivers real value, and the
[benefits of a passport](/docs/knowledge-base/digital-product-passports/what-are-the-benefits-of-a-digital-product-passport)
are genuine. The governance requirement is that optional capability is decided as optional, funded as
optional and sequenced behind required scope, rather than absorbed silently into a compliance programme
where it competes for the same scarce specialist capacity and then delays the mandatory part.

#### Classify every scope item on entry

Give each scope item one of three labels when it is first proposed: required by an applicable
obligation, required by enterprise policy, or optional capability. The classification is a
governance decision with a named owner. Items that cannot be classified are usually assumptions in
disguise, and should be recorded as such.

## Organisational Change

A passport programme changes work. Governance that does not treat that change as a governed subject
will deliver a capability into an organisation that has not been prepared to use it.

The changes typically include:

* **Responsibilities.** New ownership for information elements, evidence, supplier information quality
  and published accuracy.
* **Data ownership.** Ownership that was implicit becomes explicit and named, which is frequently
  experienced as a loss of flexibility by the people who previously held it informally.
* **Supplier interactions.** Procurement and engineering ask suppliers for information they have never
  requested, in formats they have never used, with consequences for non-response.
* **Compliance processes.** Compliance moves from periodic document assembly toward continuous
  maintenance of published information.
* **Product development processes.** Information and evidence requirements appear earlier, at design and
  sourcing rather than at launch.
* **Evidence management.** Documents that lived in personal folders and email become governed assets
  with validity, versioning and supersession.
* **Technology processes.** Change control, release and access management extend to published product
  information.
* **Operational support.** New event types, new triage, new ownership and new service expectations.
* **Approval processes.** New approvals appear, and some existing approvals become redundant and should
  be removed rather than layered.

For each change, governance should be able to answer five questions:

**Whose work changes.** Named teams and roles, not functions in general.

**What changes.** The specific activity, the specific decision, the specific record, in terms the
affected person recognises.

**When it changes.** Tied to the delivery sequence, so that people are not asked to adopt a process
before the capability supporting it exists, and are not left running two processes indefinitely.

**Who enables the change.** Who provides the guidance, the training, the tooling access, the transition
support and the time. Change that is announced but not resourced does not occur.

**How adoption is confirmed.** What observable evidence will show that the change happened, which is the
subject of the next section.

#### A change that governance missed

A programme deployed a governed evidence workflow and trained the compliance team. Nine months
later, certificate renewals were still arriving by email to individual engineers, who uploaded
them when they remembered. The workflow was fine. Nobody had governed the change to the engineers'
work, nobody owned the retirement of the old route, and the old route was faster for the person
sending the file. The capability was live and the process was not adopted.

## Driving Adoption

Adoption is whether the governed way of working is actually used. It is not training attendance,
completion rates or communications reach, all of which measure delivery of enablement rather than
change in behaviour.

Useful adoption indicators include:

* **Required processes actually used.** Submissions arriving through the governed route rather than
  around it.
* **Ownership exercised.** Named owners acting on their items rather than items ageing unattended.
* **Supplier response.** Response rates, timeliness and quality of supplier submissions across the
  segmentation tiers defined in TBF-032.
* **Exception volumes and trend.** A falling exception rate on the same scope suggests upstream
  behaviour is changing; a stable rate suggests exceptions have become the process.
* **Manual workarounds.** Spreadsheets, parallel trackers and shared mailboxes that persist after
  deployment are the clearest adoption signal available, and the least often measured.
* **Data quality improvement.** Trend in
  [data quality](/docs/knowledge-base/glossary/data-quality) measures on in-scope elements.
* **Evidence renewal performance.** Whether renewals happen before expiry or after it.
* **Operating events resolved correctly.** Whether the response followed the governed cycle or was
  improvised.
* **Decision routes used.** Whether decisions arrive through the defined route or through relationships.
* **Old processes retired.** Whether superseded routes have actually been switched off.

Two of these deserve emphasis. **Workaround persistence** is the most honest adoption measure most
organisations have, because workarounds are created by people acting rationally when the governed route
is slower, unclear or unsupported; their existence is diagnostic rather than disciplinary. **Old process
retirement** is the most neglected, because switching off a familiar route requires a decision that
someone must own, and in the absence of that decision both routes run indefinitely, which guarantees
inconsistency in published information.

Low adoption can undermine an otherwise technically successful programme completely. A passport that is
maintained by a process only half the organisation follows will be accurate for half the products, and
the organisation will not know which half.

> **Measure the workaround, not the training**
>
> If you can only track one adoption measure, track the number of in-scope submissions arriving
> outside the governed route. It is observable, hard to game, and it tells you whether the
> capability is being used or worked around.

## Change Impact Assessment

TBF-036 defines how operational changes are assessed within the running capability. This section
addresses something adjacent: assessing the organisational impact of a **programme** change before it is
approved.

For any material programme change, whether a scope addition, a process redesign, an architecture
decision or a supplier requirement change, assess impact across nine dimensions:

* **People.** Which roles are affected, how many people, and what capability they will need.
* **Process.** Which processes change, which are retired, and which are created.
* **Data.** Which elements, sources, ownership and quality expectations change.
* **Supplier.** What changes in what suppliers are asked for, from which segment, with what lead time.
* **Technology.** What must be built, configured, integrated or decommissioned.
* **Compliance.** What changes in what the organisation publishes, claims or can substantiate.
* **Controls.** Which validation controls, evidence requirements or access rules change.
* **Training.** What enablement is required, for whom, and when relative to the change.
* **Operations.** What changes in monitoring, event handling, ownership or service expectations after
  deployment.

The assessment is not a document exercise. Its governance purpose is to make the full cost of a change
visible at the moment of decision, because the visible cost of a scope addition is usually the build,
and the invisible cost is usually the supplier engagement, the training and the operational load that
follow it eighteen months later.

## Governance Across the DPP Lifecycle

Governance does not have a constant shape. Its intensity, its decision types and its centre of gravity
change as the programme moves through the stages described in TBF-031 and into the operating model of
TBF-036.

**Readiness.** Governance is light and diagnostic. The dominant decisions concern scope assumptions,
mandate, initial funding and who will hold accountability. The main risk is that no accountability is
established, so early findings have nowhere to go. See
[how organisations prepare](/docs/knowledge-base/implementation/how-should-organisations-prepare-for-digital-product-passports).

**Planning.** Governance is at its most consequential per decision. Scope, sequencing, product group
priority, architecture principles, funding envelope and the decision rights themselves are all set
here. Decisions made in this phase constrain everything after it.

**Build.** Governance intensity moves to domain authority. The programme level handles dependencies,
priority conflicts and deviation approvals; most decisions should be delegated with limits or the
programme will stall at the forum cadence.

**Validation.** Governance sets thresholds and exception boundaries, and decides the material
exceptions. Volume is high, so delegation quality is tested here more than anywhere else. See
[data validation](/docs/knowledge-base/implementation/how-to-validate-digital-product-passport-data).

**Assurance.** Governance receives the readiness conclusion and decides. This is the highest stakes
decision moment in the programme: deploy, deploy with conditions, or do not deploy. See
[testing and assurance](/docs/knowledge-base/implementation/how-to-test-and-assure-a-digital-product-passport).

**Deployment.** Governance decides the transition itself: whether operational readiness exists, who owns
open conditions, and when the project may close. Closing a project with unowned conditions is the single
most common governance failure at this point.

**Operations.** Programme governance contracts, and operational governance takes over the continuing
flow. Some programme governance becomes permanent: authority over material exceptions, regulatory
change response, scope extension to new product groups, and periodic outcome review. Governance should
not disappear at go-live, and where it does, the organisation discovers within a year that nobody has
authority to respond to a delegated act.

## Project vs Programme vs Operations

Three words are used loosely and mean different things for governance.

A **project** delivers defined outputs within a defined period and then ends. Its governance is
principally about delivery: scope, schedule, cost, quality and risk against a plan.

A **DPP programme** coordinates interconnected organisational changes and capabilities across multiple
functions, product groups and time horizons, where the outcome is a durable capability rather than a
delivered output. Its governance is principally about decisions and change: authority, prioritisation,
conflict, adoption and outcome.

**Operations** maintains the live capability indefinitely. Its governance is principally about control:
event response, service expectations, continuing accuracy and continuing accountability.

No organisation is required to label its passport work a programme. A smaller organisation with one
product group and a handful of suppliers may reasonably run it as a project, provided it recognises that
the operating capability outlives the project and that adoption is part of the work rather than an
afterthought. The educational distinction is about scope and responsibility, not vocabulary.

## Programme Metrics

Governance metrics exist to support decisions. Where they exist to demonstrate activity, they generate
reporting theatre: extensive packs, confident percentages and no basis for action.

Measures that tend to support decisions include:

* **Scope coverage.** Proportion of in-scope products, elements and markets with defined requirements.
* **Requirements resolved.** Open requirement questions and assumptions closed against those still open.
* **Major decisions outstanding.** The count of framed decisions awaiting authority.
* **Decision ageing.** How long framed decisions wait, which measures the governance system itself.
* **Unresolved critical risks.** Risks accepted, mitigated and unowned.
* **Exceptions by type.** Volume, severity, age and expiry status.
* **Overdue conditions.** Assurance conditions past their deadline, which is a leading indicator of
  post-deployment trouble.
* **Supplier readiness.** Position across the segmentation tiers of TBF-032.
* **Data quality trend.** Direction of travel on in-scope elements rather than a point measure.
* **Evidence readiness.** Proportion of required evidence accepted, valid and current.
* **Assurance status.** Coverage achieved and outstanding findings by severity.
* **Deployment readiness.** Against the criteria agreed in advance, not assembled at the decision.
* **Adoption indicators.** As described above, especially workaround persistence and process retirement.
* **Operational stability after deployment.** Event volume, recurrence and resolution quality.

Percentage complete is the least informative measure a passport programme can report, because the
remaining work is rarely proportional to the remaining tasks. A programme can be ninety percent complete
on build and nowhere on supplier evidence, which is the position that determines whether it can publish.

#### Reporting green until the month before deployment

Status that depends on task completion stays green while the genuinely hard dependencies, supplier
evidence, authoritative sources, assurance conditions and adoption, remain unresolved. Measures
that track those dependencies directly turn amber early, which is what governance needs.

## Practical Example

A manufacturer is preparing passport capability across several product groups for EU markets. Four
governance decisions, in sequence.

### Example 1: A regulatory and scope decision

One product group has clearer near-term requirements than another, whose obligations depend on a
delegated act that is still in preparation.

**Identify.** The programme cannot plan both groups with equal confidence, and capacity is not
sufficient to prepare both fully in parallel. This is a scope and priority decision, not an analysis
task.

**Frame.** The question: which product group is prepared to deployment readiness first, and what
posture is adopted for the second. Evidence: the regulatory position for each group, the data and
supplier readiness assessment, capacity, and the timeline exposure if the second group's requirements
arrive earlier than expected. Options: prepare group A fully and monitor group B; prepare both
partially; prepare the shared enterprise capability first and neither group fully. Dependencies: shared
data foundation and architecture work. Regulatory implication: neither choice creates non-compliance
today; the second option reduces exposure and delays capability. Deadline: before the build stage
commits capacity.

**Assign authority.** Programme governance, since it spans product, data, supplier and investment
domains and does not exceed the executive threshold for enterprise priority.

**Decide.** Approve with conditions: prepare group A to deployment readiness while building the shared
enterprise capability in a form reusable by group B, and maintain active regulatory monitoring on group
B with a defined trigger for reprioritisation.

**Record.** The decision, its rationale, its scope, the reusability condition on the shared capability,
and the review trigger: publication of a draft delegated act affecting group B, or a change in expected
timing.

**Execute.** Sequence the roadmap accordingly, brief the supplier workstream to engage group A suppliers
first, and assign regulatory monitoring for group B to the compliance domain.

**Review.** At each stage gate, and immediately on the trigger. When a draft act for group B appears
sooner than assumed, the decision returns to governance rather than being absorbed silently by the
delivery plan.

### Example 2: A supplier exception

A critical supplier cannot provide required information by the planned pilot date.

**Supplier impact.** The supplier provides a component present in most products in the pilot group. It
is a tier A supplier under the segmentation of TBF-032, and no alternative source is available inside
the pilot timescale.

**Regulatory implication.** The affected element supports a claim expected to be within scope for the
product group. Publishing the claim without the underlying information is not an option; publishing
without the claim, or deferring the affected products, both are.

**Programme options.** Proceed with the pilot excluding the affected products; proceed including them
with the element withheld and the limitation recorded; delay the pilot; invest in direct supplier
enablement to close the gap; escalate commercially through the contractual relationship.

**Decision authority.** The supplier domain authority may decide supplier remediation approach. The
decision to change pilot scope exceeds that limit and belongs to programme governance. The decision is
therefore escalated as framed, with a recommendation.

**Conditional decision.** Programme governance approves proceeding with the pilot including the affected
products, with the element withheld, on three conditions: the limitation is recorded as an exception with
a defined expiry, supplier enablement is funded and begins immediately with a named owner, and the
element must be closed before the group moves from pilot to deployment.

**Recorded rationale.** The pilot's purpose is to prove the capability rather than to publish complete
information for the group, the withheld element does not create a misleading published statement, and
the exception has a defined end tied to the deployment decision rather than to a date.

### Example 3: An assurance decision

Assurance concludes ready with conditions under TBF-035: two medium severity findings remain open, one
concerning evidence renewal monitoring and one concerning the completeness of an integration failure
path.

**Whether deployment proceeds.** Programme governance holds the authority. Assurance provides the
conclusion and the evidence; it does not authorise deployment, and delivery does not overrule assurance.

**Who owns the conditions.** Each condition receives a named owner in the receiving operational
organisation rather than in the project, because the project will close. The evidence renewal condition
goes to evidence operations, the failure path condition to the technology domain.

**Deadlines.** Each condition receives a date, and the dates precede the point at which the untested
path is likely to matter, not the point at which the project team disbands.

**Monitoring.** The conditions migrate into operational tracking as described in TBF-036, and appear in
the governance metric set as overdue conditions if they pass their date.

**Escalation.** A condition passing its deadline escalates automatically to programme governance, which
retains the authority to reconsider the deployment decision, including restricting publication scope
until the condition is closed.

### Example 4: An adoption problem

Six months after deployment, teams in two of five product groups continue to manage supplier
certificates through the previous email-based process, outside the governed evidence workflow.

**Why this matters.** Technically live is not organisationally adopted. Evidence handled outside the
governed route is not tracked for validity, is not associated with the claims it supports, and will not
trigger renewal before expiry. The passport continues to render, and its evidentiary basis is quietly
decaying for two fifths of the estate.

**What governance does.** First, it treats this as a decision rather than a compliance reminder.
Identify: adoption failure with a regulatory consequence. Frame: which teams, which volume, why the old
route persists, what the exposure is, and what the options are.

**Why the old route persists** is the critical question, and the answer is usually structural rather than
attitudinal: the governed route required a system access the teams did not have, or added steps without
removing the old ones, or nobody switched the old mailbox off.

**Assign authority.** The change and adoption domain, with the functional leaders of the two product
groups, since the resolution requires their capacity.

**Decide and execute.** Assign a named owner for adoption in each group, resolve the structural barrier,
retire the old route on a defined date, reconcile the evidence collected outside the workflow into the
governed register, and add workaround volume to the operational metric set so recurrence is visible.

**Review.** At a defined interval, on the observable measure of submissions arriving through the governed
route, rather than on assurances that the teams now understand the process.

## Common Mistakes

#### Governance means having a steering committee

A committee is a mechanism. Governance is the system of accountability, authority, decisions,
conflict resolution, risk acceptance, scope control, investment prioritisation, change approval,
adoption and review. Organisations that establish the committee and stop have created a meeting,
and the decisions the meeting cannot reach will be made informally elsewhere.

#### Every decision should go to the steering committee

Routing everything upward destroys both speed and attention. The committee spends its time on
matters that should have been delegated and gives insufficient consideration to the few decisions
that genuinely need it, while delivery waits for the calendar.

#### Consensus is required for every decision

Consensus is valuable where it is achievable and cheap. Requiring it universally means the most
contested decisions, which are usually the most urgent and most consequential, are the ones the
programme cannot make. Authority exists precisely for the cases where agreement is not available
in time.

#### RACI defines decision authority

RACI maps involvement in activities. Being accountable in a RACI does not necessarily mean holding
the right to decide, and being responsible certainly does not. Where a programme relies on a RACI
to answer who decides, it usually finds that the matrix is silent at exactly the moment the
question is asked.

#### Data governance and programme governance are the same

Product data governance answers who owns, controls and stewards product data, and it outlives the
programme. Programme governance answers who has authority over programme decisions, including
scope, investment, risk, change and adoption. Merging them produces either a data function asked
to decide investment and scope, or a programme body asked to arbitrate data definitions.

#### The project manager owns every programme decision

A programme manager typically owns the process by which decisions are framed, routed, recorded and
followed up. Owning the process is not the same as holding the authority. Where the two are
conflated, the manager is held accountable for decisions they were never empowered to make, and
domain authorities disengage.

#### Technical go-live means organisational adoption

Deployment proves the capability exists. Adoption is whether the organisation uses it. A
capability in production with half its intended users working around it produces published
information maintained by a process that is only partly followed, which is a compliance exposure
rather than a delivery success.

#### Training completion means adoption

Attendance and completion measure the delivery of enablement, not the change in behaviour. People
frequently complete training and then continue with the previous process because it is faster,
because access was not provisioned, or because the old route was never closed.

#### Every exception can be accepted by the delivery team

Exceptions accepted under delivery pressure by the people most affected by delay are
systematically biased toward acceptance. Exception authority should be allocated deliberately by
severity and regulatory significance, with limits on scope and duration, and blocking or regulated
exceptions should not sit with delivery.

#### Scope can expand as long as the technology supports it

Technical feasibility is the least binding constraint in a passport programme. The binding
constraints are specialist capacity, supplier response, evidence acquisition and organisational
change, none of which scale with the platform. Scope decisions made on technical grounds routinely
commit resources the organisation does not have.

#### Governance ends at go-live

Operational governance takes over the continuing flow, but material exception authority,
regulatory change response, scope extension and outcome review remain. Programmes that dissolve
governance at deployment discover the gap when the first delegated act, audit query or supplier
failure arrives and nobody can decide the response.

#### More committees mean stronger governance

Each additional body dilutes attendance, lengthens decision routes and increases the chance that a
decision falls between two of them. Strength comes from clarity of authority and quality of
decision framing, not from the number of forums.

#### Escalation means governance has failed

Escalation is the mechanism working. Treating it as failure produces the alternative, which is
decisions made below the appropriate authority by people avoiding the appearance of not coping.
What indicates failure is escalation that is unframed, escalation that has no route, or escalation
that arrives too late to change anything.

#### Programme reporting is the same as programme governance

Reporting describes state. Governance decides what to do about it. A programme with a
sophisticated reporting cadence and undefined decision rights will produce excellent visibility of
a situation nobody is empowered to change.

## Frequently Asked Questions

**Does any regulation require this governance model?**\
No. The DPP Programme Governance Model is a tieback educational framework. Legislation establishes
requirements about products, information and its availability, and places legal accountability on
identified economic operators. How an organisation structures internal authority to meet those
obligations is an enterprise choice.

**Must we establish a DPP steering committee?**\
No. Nothing requires a committee, and in smaller organisations one may be unnecessary. What is required
practically, not legally, is that accountability and decision rights are clear. A structure is one way to
express that.

**Is RACI mandatory?**\
No. RACI is one optional responsibility mapping technique. A decision rights matrix, a written delegation
schedule or existing enterprise governance instruments may serve better. What matters is that authority is
consultable, not the notation used.

**Does programme governance replace legal accountability?**\
No. Legal accountability sits where legislation places it, on the relevant economic operator, and internal
governance arrangements do not transfer or dilute it. Governance helps an organisation meet its
obligations; it does not substitute for them.

**Do all DPP decisions require executive approval?**\
No, and a model that implies so is unworkable. Most decisions should be delegated to domain authority or
delivery with stated limits. Executive involvement should be reserved for enterprise priority, major
investment, major scope and major risk.

**Does every organisation need a standalone programme organisation?**\
No. A smaller organisation may run passport work within existing structures, combining several governance
levels in a few people. The model describes functions that need to exist somewhere, not headcount.

**Are the seven decision domains a regulatory classification?**\
No. They are tieback educational categories for organising governance thinking, and no legislation requires
decisions to be categorised this way.

**Where does product data governance stop and programme governance start?**\
Product data governance decides ownership, stewardship, authoritative sources, definitions and quality
policy for product data as an enterprise asset. Programme governance decides programme scope, priority,
investment, risk acceptance, change and adoption, and holds authority over material exceptions to data
policy where they have programme or regulatory consequence.

**Who should decide whether to deploy after a ready with conditions outcome?**\
Not the assurance function that produced the conclusion, and not the delivery function under schedule
pressure. Deployment authority belongs to programme governance, which can weigh regulatory exposure,
condition ownership and commercial consequence together.

**How much governance is proportionate for a small programme?**\
Enough to answer four questions without discussion: who is accountable, who may decide what within which
limits, what must escalate, and how decisions are recorded. For a small organisation that may be a single
page and a monthly review.

**How long should decision records be kept?**\
Long enough to explain decisions across requirement changes, audits and personnel changes, which in
practice means the life of the products concerned. Retention should follow the organisation's existing
records policy rather than a rule invented for the programme.

**Does governance slow the programme down?**\
Undefined governance slows programmes down, because decisions circulate. Defined governance with generous
delegation and clear limits is usually faster than the informal alternative, because most decisions never
need to travel.

## Key Takeaways

## Related Articles

* [How to Operate a Digital Product Passport Programme](/docs/knowledge-base/implementation/how-to-operate-a-digital-product-passport-programme)
* [DPP Governance: Who Owns What?](/docs/knowledge-base/compliance-frameworks/dpp-governance-who-owns-what)
* [How to Build a Digital Product Passport Implementation Roadmap](/docs/knowledge-base/implementation/how-to-build-a-digital-product-passport-implementation-roadmap)
* [How to Manage Evidence for Digital Product Passports](/docs/knowledge-base/implementation/how-to-manage-evidence-for-digital-product-passports)
* [How to Prepare Suppliers for Digital Product Passports](/docs/knowledge-base/implementation/how-to-prepare-suppliers-for-digital-product-passports)
* [How to Test and Assure a Digital Product Passport](/docs/knowledge-base/implementation/how-to-test-and-assure-a-digital-product-passport)
* [How to Validate Digital Product Passport Data](/docs/knowledge-base/implementation/how-to-validate-digital-product-passport-data)
* [How Should Organisations Prepare for Digital Product Passports?](/docs/knowledge-base/implementation/how-should-organisations-prepare-for-digital-product-passports)

## Related Glossary Terms

* [Digital Product Passport](/docs/knowledge-base/glossary/digital-product-passport)
* [Product Data Governance](/docs/knowledge-base/glossary/data-governance)
* [Product Data Stewardship](/docs/knowledge-base/glossary/data-stewardship)
* [Product Data Quality](/docs/knowledge-base/glossary/data-quality)
* [Authoritative Source](/docs/knowledge-base/glossary/authoritative-source)
* [System of Record](/docs/knowledge-base/glossary/system-of-record)
* [Source of Truth](/docs/knowledge-base/glossary/source-of-truth)
* [Product Master Data](/docs/knowledge-base/glossary/product-master-data)
* [Data Architecture](/docs/knowledge-base/glossary/data-architecture)
* [Economic Operator](/docs/knowledge-base/glossary/economic-operator)
* [Delegated Act](/docs/knowledge-base/glossary/delegated-act)
* [ESPR](/docs/knowledge-base/glossary/espr)
* [Market Surveillance](/docs/knowledge-base/glossary/market-surveillance)
* [Product Lifecycle](/docs/knowledge-base/glossary/product-lifecycle)

## Related Docs

* [Implementation](/docs/knowledge-base/implementation/overview)
* [How to Operate a Digital Product Passport Programme](/docs/knowledge-base/implementation/how-to-operate-a-digital-product-passport-programme)
* [How to Test and Assure a Digital Product Passport](/docs/knowledge-base/implementation/how-to-test-and-assure-a-digital-product-passport)
* [How to Manage Evidence for Digital Product Passports](/docs/knowledge-base/implementation/how-to-manage-evidence-for-digital-product-passports)
* [How to Validate Digital Product Passport Data](/docs/knowledge-base/implementation/how-to-validate-digital-product-passport-data)
* [How to Prepare Suppliers for Digital Product Passports](/docs/knowledge-base/implementation/how-to-prepare-suppliers-for-digital-product-passports)
* [How to Build a Digital Product Passport Implementation Roadmap](/docs/knowledge-base/implementation/how-to-build-a-digital-product-passport-implementation-roadmap)
* [What is Product Data Governance?](/docs/knowledge-base/enterprise-systems-and-data-architecture/what-is-product-data-governance)

## References

* Regulation (EU) 2024/1781 establishing a framework for the setting of ecodesign requirements for
  sustainable products, including the Digital Product Passport provisions, Official Journal of the
  European Union: [https://eur-lex.europa.eu/eli/reg/2024/1781/oj](https://eur-lex.europa.eu/eli/reg/2024/1781/oj)
* Regulation (EU) 2023/1542 concerning batteries and waste batteries, including the battery passport
  provisions, Official Journal of the European Union: [https://eur-lex.europa.eu/eli/reg/2023/1542/oj](https://eur-lex.europa.eu/eli/reg/2023/1542/oj)
* Regulation (EU) 2019/1020 on market surveillance and compliance of products, Official Journal of the
  European Union: [https://eur-lex.europa.eu/eli/reg/2019/1020/oj](https://eur-lex.europa.eu/eli/reg/2019/1020/oj)
* Regulation (EU) 2016/679 on the protection of natural persons with regard to the processing of
  personal data, Official Journal of the European Union: [https://eur-lex.europa.eu/eli/reg/2016/679/oj](https://eur-lex.europa.eu/eli/reg/2016/679/oj)

## About This Article

About This Article

<dl>
  <dt>
    Last Reviewed
  </dt>

  <dd>
    2026-08-09
  </dd>

  <dt>
    Next Scheduled Review
  </dt>

  <dd>
    2027-08-09
  </dd>

  <dt>
    Article Version
  </dt>

  <dd>
    1.0
  </dd>
</dl>

tieback Knowledge is a continuously maintained reference library covering Digital Product
Passports, product traceability, product compliance and related regulations. Articles are
reviewed regularly as legislation, standards and implementation guidance evolve.